| Stretch: | Above the Cheakamus Lakes Rd |
| Difficulty: | Class IV+ |
| Distance: | 1.85 miles |
| Flows: | ~1.9 m (low) to 2.7+ (high) (visual gauge at the House Rock Take-out). Current Water Office gauge |
| Gradient: | 135 fpm average |
| Put-in: | At the Riparian Trail access close to the river (3 or 4 access points up the road) |
| Take-out: | House Rock parking area, near the treatment plant |
| Shuttle: | 2.6 km (5 minutes, ok dirt, one rough spot needing a little clearance) |
| Season: | It can be run anywhere from April / May (as soon as the snow on the road melts out) - typically high in May / June with all of the runoff (2.6 - 3.0), then goes slowly lower (2.5 - 2.7) until late August / September when it generally becomes too low (less than 2.2) |
| Featured in Video A Wet State #79 | |